Bond/Sinking Fund
Updates |
- Laying concrete in
hallway and new art room
 |
- Laying blocks in
new Media Center, Open in Fall
 |
-Working on Front
Entrance, Open in Fall
 |
- New Elevator Pit
 |
- Walls being built,
West Entrance
 |
- Steel being
installed, Media Center
 |
- Block work on
Elevator Shaft, Open Fall
 |
- Installing Panels
and Windows at East River
 |
- Looking out New
Windows at East River
 |
- Web Joist in
Computer Lab and Hallway
 |
- July Bond Advisory
group at High School
 |
- Meridian Classroom Flooring
 |
- Meridian Main
Entrance Ceramic Flooring
 |
-Installation of
Beams over Gym Hallway
 |
- Look of the Gym
Hallway from Roof
 |
- Science Cabinets
Arriving
 |
- Pouring of Pad at
Receiving
 |
- Working on Gym Hall
 |
- Laying Brick on
West Entrance
 |
- Steelwork being
installed at Kitchen Entrance
 |
- Remodeled Science
Room
 |
- Painting of
Additional Classrooms
 |
| - Block layers mobile life arriving
 |
- Installing sewer on a Saturday so not to affect school
 |
|
- Blocks being laid
next to the band room
 |
-
Laying first block for the new addition at the H.S
 |
- Cement arriving for
Media Center footings
 |
- Blocks being laid
by mobile lift next to art room
 |
- 30 foot walls
almost done for the new
media center
 |
- Mallard baby ducks
after hatching at Meridian School, Eggs came from construction site at
HS
 |
|
- Baby Ducks in the
sink in Mishelle Tracy's classroom at Meridian
 |
- Candi DeFran's
class having a lesson in math on the eight eggs that hatched out of the
eleven eggs
that came from the HS.
 |
|
- "Picture I took
going from C.O to H.S. one morning reminding me why we live here. The
same kind of view I had out my Kindergarten room back in the 1911
building in1949." - Jack Hayward
 |
|
- The
future High School

 |
- Transplanting
trees along sidewalk at High School
 |
- Installing
soccer bleachers at Middle School
 |
- Bid openings
for construction contractors
 |
- Windows and
doors removed from construction area
 |
- Construction
fences being installed
 |
- Construction
trailer being installed
 |
- Porch roof by
gym being demolished
 |
- Ten mallard
eggs discovered during clearing
 |
- Packaged
mallard eggs being relocated to Meridian by yearbook students
 |
- Blocks being
delivered to High School
 |
- Footings being
poured for future art room
 |
| - Storage containers are
delivered for high
school teachers to store their belongings in while construction is going
on over the next year |
|
 |
| - Another test room at Meridian of carpet tile
from Shaw Carpet installed. |
|
 |
- Pre bid meeting
- Team meeting with Tony Krukowski, Business Manager, Jack Hayward,
Owner's Rep, & Tim from Wolgast Construction and his field people, Dan
Jerome from French and Associates, Collie
Hooper-Yan, School Board Member, and our architects.
- Contractors looking at the specification books
and drawings
 |
- Met with Duncan Murdock,
Fire Chief and Tom Podjaski of
the construction company going over fencing and safety at the high school. - Met with Delores
Elswick, HS Principal, on
construction fencing, Traffic Flow and teacher, student, and worker
parking areas. - Met with Tony Krantz from of Transportation on bus traffic
and flow. |
| - Bids are due for the high school
on March 14, 2007 |
| - Bid recommendations from Wolgast Corporation
- March 27, 2007 |
BID APPROVAL
- Recommendation of bidders for the high school
construction to school board for approval - Recommendation on the bleacher bid to the school
board - Recommendation on the Track bid to the school
board - Recommendation on the stage curtain bid to the
School board |
| - MARCH 6, 2007 - Construction starts on the high school with
construction fencing going up |
| - Wireless
Laptop Cart for Students at the Middle School, creating a writing lab in the classroom. |
| - New notebook
computers for teachers |
- Bid recommendations for
new phone system on March 7 - Bid recommendations for Network Electronics and
Cabling on March 7 |